Case Studies

Topographical and GPR Survey

Topographical and GPR Survey

Drone and LiDAR Survey

Drone and LiDAR Survey

Third Party Utility Searches and Composite Plan Production

Third Party Utility Searches and Composite Plan Production

300 Acre Data Collection

300 Acre Data Collection

Drainage Survey

Drainage Survey

Large Scale Topographical Survey

Large Scale Topographical Survey

OHL Inspection Services

OHL Inspection Services

Tower Verticality, Monitoring & Scanning

Tower Verticality, Monitoring & Scanning

Sewer Adoption Pack

Sewer Adoption Pack

Topographical and Measured Building Survey

Topographical and Measured Building Survey

Pole Top Camera Inspections

Pole Top Camera Inspections

Underground Cable Route Design Pentir Wider Works 400kV

Underground Cable Route Design Pentir Wider Works 400kV

Underground Cable Route Design Iver – Yiewsley 132kV (66kV Rated)

Underground Cable Route Design Iver – Yiewsley 132kV (66kV Rated)

Thatcham – Aldermaston 33kV

Thatcham – Aldermaston 33kV

400kV Full Line Tension (FLT) Gantry

400kV Full Line Tension (FLT) Gantry

Survey – Laser Scanning Wall Rendering Flatness Survey

Survey – Laser Scanning Wall Rendering Flatness Survey

Overhead Line Optioneering Study

Overhead Line Optioneering Study

Refurbishment of Clunie–Coupar Angus 132kV Overhead Line

Refurbishment of Clunie–Coupar Angus 132kV Overhead Line

New Mills – Glossop 33kV OHL

New Mills – Glossop 33kV OHL

J, BA & AY 132kV Refurbishment

J, BA & AY 132kV Refurbishment

Previous Next
Close
Test Caption
Test Description goes like this
Top
Quick Enquiry



    Before you proceed please tick to state you have read and agreed to our Privacy & Cookie Policy

    X
    Quick Enquiry